The Cameron County Housing Authority (CCHA) is requesting a quotation from a qualified contractor for repairs and cleanout at 213 Orive Blvd Unit #968 Los Fresnos, TX Date and time of Submission: April 3, 2024 at 3:00p.m. Person to receive quote: Daisy Flores, Executive Director Please submit Via Email to dflores@cchatx.org and copy alucio@cchatx.org For more information regarding the visual site, contact Brandon Acevedo at (956) 538-1312

 

Cameron County Housing Authority reserves the right to accept or reject any or all quotes or to waive any informality.  No quotes shall be withdrawn for a period of 45 days subsequent to the award of the bid without the consent of the Cameron County Housing Authority.  The Housing Authority is an equal opportunity employer and contracting agency.

 

213 Orive Blvd Unit#968 Los Fresnos, TX

 

Unit turnaround

 

 

1.       1. repair ceiling thru out the unit including closets with Monterrey orange peel style

2.       2. remove nails & cover nail holes thru out the unit

3.       3. sand & paint window sills thru out the unit (CCHA will provide white oil base paint)

4.       4. remove all door stopper & replace all door stoppers after walls have been painted thru out the unit

5.       5. paint walls thru out the unit including closets (CCHA will provide paint)

6.       6. replace base boards thru out the unit and paint with white oil base paint (CCHA will provide base boards and paint).

8.       7. replace floor tiles thru out the unit (CCHA will provide floor tiles)

9.       8. replace all outlet, switches, outlet covers, switch covers, GFI, and GFI covers thru out the unit (CCHA will provide outlets, switches, outlet covers, switch covers, GFI, and GFI covers)

11.   9. re-sand & repair all corner beads thru out the unit

12.   10. remove and install light fixture thru out the unit (CCHA will provide fixture)

13.   11. remove & replace all ceiling vent covers (CCHA will provide vent covers)

14.   12. paint all door frames with white oil base paint (CCHA will provide paint)

15.   13. remove all closet shelves, closet rods thru out the unit, paint with white oil base paint and reinstall properly, caulk if needed (CCHA will provide aint and caulking)

16.   14. pressure wash windows dry them up & clean the window panes thru the inside

17.   15. pressure wash the exterior of the building

18.   16. contractor must remove all debris & dispose of them

 

Living room:

19.   17. remove & replace front entrance door and door frame and paint (CCHA will provide door, door frame, and paint)

20.   18. replace front entrance weather strip (CCHA will provide weather strip)

21.   19. replace piston in front entrance screen door (CCHA will provide piston)

22.   20. sand and paint window sills (CCHA will provide paint)

Dining Area:

23.   21. sand and paint window sill (CCHA will provide paint)

 

Kitchen:

24.   22. clean, sand, varnish, and paint cabinet doors and drawers (CCHA will provide white paint)

25.   23. clean and paint cabinet shelves (CCHA will provide paint)

26.   24. install cabinet door/drawer handles (CCHA will provide handles)

27.   25. replace counter top & back splash (CCHA will provide counter top)

28.    26. replace kitchen faucet (CCHA will provide kitchen faucet)

29.   27. replace & install stove back splash board (CCHA will provide stainless steel board)

30.   28. remove and replace range hood (CCHA will provide range hood)

31.   29. remove and replace pantry door and paint door (CCHA will provide door and paint)

32.   30. food pantry degreased, clean, remove shelves and paint shelves with white oil base paint and reinstall shelves properly (CCHA will provide paint)

32.  31. install pantry door knob and pin stopper (CCHA will provide door knob and pin stopper)

31.  32. sand and paint window sill (CCHA will provide paint)      

 

 

Right Hall:

 33. sand and paint window sill with white oil base (CCHA will provide white paint)

 

 

Restroom:

34.  34. remove and replace door and paint with white oil base paint (CCHA will provide door and paint)

34.  35. install doorknob (CCHA will provide new doorknob)

 36. remove medicine cabinet, fix wall & place mirror (CCHA will provide glass)

37.  37. remove and replace light fixture (CCHA will provide light fixture)

34.  38. replace lavatory cabinet (CCHA will provide cabinet lavatory cabinet)

34.  39. replace lavatory faucet (CCHA will provide faucet)

34.  40. replace toilet (CCHA will provide toilet)

34.  41. remove old Formica wall, retexture sheetrock wall and paint (CCHA will provide joint compound & paint)

 42. replace exhaust vent (CCHA will provide exhaust vent)

Bedroom:


37.  43. window sills sand & paint with white oil base paint (CCHA will provide paint)

34.  44. remove & replace bedroom door and paint with white oil base paint (CCHA will provide door & paint)

34.  45. remove & replace closet door and paint with white oil base paint (CCHA will provide door and paint)

34.  46. install new door knobs (CCHA will provide door knobs)



Back Hall:


37.  47. paint back door with white oil base paint (CCHA will provide paint)

34.  48. remove & replace closet door and paint with white oil base paint (CCHA will provide door & paint)

34.  49. install closet rod (CCHA will provide closet rod)



Bedroom:


37.  50. window sills sand & paint with white oil base paint (CCHA will provide paint)

34.  51. remove & replace bedroom door and paint with white oil base paint (CCHA will provide door & paint)

34.  52. remove & replace closet door and paint with white oil base paint (CCHA will provide door and paint)

34.  53. install new door knobs (CCHA will provide door knobs)


Heater Closet:


37.  54. paint heater closet (CCHA will provide paint)


Restroom:


37.  55. remove medicine cabinet fix wall & place mirror (CCHA will provide glass)

34.  56. replace lavatory cabinet (CCHA will provide cabinet)

34.  57. replace lavatory faucet (CCHA will provide faucet)

34.  58. replace toilet (CCHA will provide toilet)

34.  59. remove & replace wall light fixture (CCHA will provide fixture)

34.  60. remove old Formica wall, retexture sheetrock wall and paint (CCHA will provide joint compound & paint)

34.  61. replace exhaust vent (CCHA will provide exhaust vent)



Breaker Box:


37.  62. paint metal cover (CCHA will provide grey spray paint)


Left Hall:


37.  63. replace new smoke alarm (CCHA will provide smoke alarm)

37.  64. repair hole on wall by thermostatnt



Washer Room:


37.  65. replace washer connections (CCHA will provide washer connections)

37.  66. replace board (CCHA will provide board)


Restroom:


37.  67. remove & replace door and paint with white oil base paint (CCHA will provide door & paint)

34.  68. remove medicine cabinet, fix wall & place mirror (CCHA will provide glass)

34.  69. remove & replace light fixture (CCHA will provide light fixture)

34.  70. replace lavatory cabinet (CCHA will provide cabinet)

34.  71. replace lavatory faucet (CCHA will provide faucet)

34.  72. replace toilet (CCHA will provide toilet)

34.  73. remove old Formica wall, retexture sheetrock wall and paint (CCHA will provide joint compound & paint)

34.  74. replace exhaust vent (CCHA will provide exhaust vent)


Water heater closet:


37.  75. remove water heater to paint walls, ceiling, and replace tiles

37.  76. paint water heater closet (CCHA will provide paint)

Clothe Hamper:


 77. sand & paint with white oil base paint (CCHA will provide paint)

Right Hand Side 1st Bedroom:


37.  78. remove & replace bedroom door and paint with white oil base paint (CCHA will provide door & paint)

37.  79. install new doorknob (CCHA will provide door knob)

37.  80. sand & paint window sill with white oil base paint (CCHA will provide paint)

Right Hand Side 2nd Bedrom:


37.  81. remove & replace bedroom door and paint with white oil base paint (CCHA will provide door & paint)

37.  82. install new doorknob (CCHA will provide doorknob)

37.  83. sand & paint window sills with white oil base paint (CCHA will provide paint)

Left Hand Side Bedroom:


37.  84. remove & replace bedroom door and paint with white oil base paint (CCHA will provide door & paint)

37.  85. install new doorknob (CCHA will provide doorknob)

37.  86. sand & paint window sill with white oil base paint (CCHA will provide paint)

Outside Storage:


37.  87. remove & install light fixture (CCHA will provide fixture)

37.  88. repair and patch storage door on the interior top side

37.  89. readjust storage door so that it closes properly

37.  90. paint storage door (CCHA will provide paint)

 

 

213 Orive Blvd Unit#969 Los Fresnos, TX

 

Unit turnaround

 

 

1.       91. repair ceiling thru out the unit including closets with Monterrey orange peel style

2.       92. remove nails & cover nail holes thru out the unit

3.       93. sand & paint window sills thru out the unit (CCHA will provide white oil base paint)

4.       94. remove all door stopper & replace all door stoppers after walls have been painted thru out the unit

5.       95. paint walls thru out the unit including closets (CCHA will provide paint)

6.       96. replace base boards thru out the unit and paint with white oil base paint (CCHA will provide base boards and paint).

8.       97. replace floor tiles thru out the unit (CCHA will provide floor tiles)

9.       98. replace all outlet, switches, outlet covers, switch covers, GFI, and GFI covers thru out the unit (CCHA will provide outlets, switches, outlet covers, switch covers, GFI, and GFI covers)

11.   99. re-sand & repair all corner beads thru out the unit

12.   100. remove and install light fixture thru out the unit (CCHA will provide fixture)

13.   101. remove & replace all ceiling vent covers (CCHA will provide vent covers)

14.   102. paint all door frames with white oil base paint (CCHA will provide paint)

15.   103. remove all closet shelves, closet rods thru out the unit, paint with white oil base paint and reinstall properly, caulk if needed (CCHA will provide aint and caulking)

16.   104. pressure wash windows dry them up & clean the window panes thru the inside

17.   105. pressure wash the exterior of the building

18.   106. contractor must remove all debris & dispose of them

 

 

Living room:

19.   107. remove & replace front entrance door and paint (CCHA will provide door and paint)

20.   108. remove & replace front entrance door frame and paint (CCHA will provide door frame and paint)

21.   109. sand and paint window sills (CCHA will provide paint)

22.  

Dining Area:


 110. sand and paint window sill (CCHA will provide paint)

 

Kitchen:

24.   111. clean, sand, varnish, and paint cabinet doors and drawers (CCHA will provide white paint)

25.   112. clean and paint cabinet shelves (CCHA will provide paint)

26.   113. install cabinet door/drawer handles (CCHA will provide handles)

27.   114. replace counter top & back splash (CCHA will provide counter top)

28.   115. install kitchen faucet (CCHA will provide kitchen faucet)

29.   116. replace & install stove back splash board (CCHA will provide stainless steel board)

30.   117. remove and replace range hood (CCHA will provide range hood)

31.   118. remove and replace pantry door and paint door (CCHA will provide door and paint)

32.   119. food pantry degreased, clean, remove shelves and paint shelves with white oil base paint and reinstall shelves properly (CCHA will provide paint)

32.  120. install pantry door know and pin stopper (CCHA will provide door knob and pin stopper)

31.  121. sand and paint window sill (CCHA will provide paint)      

Right Hall:


37.  122. replace new smoke alarm (CCHA will provide smoke alarm)

37.  123. sand and paint window sill with white oil base paint (CCHA will provide paint)

37.  124. replace bottom window glass (CCHA will provide glass)

37.  125. repair and fix patch on wall around light switch area

 

 

Restroom:


37.  126. remove & replace door and paint with white oil base paint (CCHA will provide door & paint)

37.  127. install doorknob (CCHA will provide new doorknob)

34.  128. remove medicine cabinet, fix wall & place mirror (CCHA will provide glass)

34.  129. remove & replace light fixture (CCHA will provide light fixture)

34.  130. replace lavatory cabinet (CCHA will provide cabinet)

34.  131. replace lavatory faucet (CCHA will provide faucet)

34.  132. replace toilet (CCHA will provide toilet)

34.  133. remove old Formica wall, retexture sheetrock wall and paint (CCHA will provide joint compound & paint)

34.  134. replace exhaust vent (CCHA will provide exhaust vent)

Bedroom:


37.  135. back window replaced window sill and paint with white oil base paint (CCHA will provide paint)

34.  136. repair sides of the wall by back window and paint (CCHA will provide paint)

34.  137. front window sill sand & paint with white oil base paint (CCHA will provide paint)

34.  138. remove & replace bedroom door and paint with white oil base paint (CCHA will provide door & paint)

34.  139. remove & replace closet door and paint with white oil base paint (CCHA will provide door & paint)

34.  140. install new door knobs (CCHA will provide door knobs)

Back Hall:


37.  141. repair & fix patch on wall next to bedroom door

34.  142. paint back door with white oil base paint (CCHA will provide paint)

34.  143. remove & replace closet door and paint with white oil base paint (CCHA will provide door & paint)



Bedroom:


37.  144. window sills sand & paint with white oil base paint (CCHA will provide paint)

34.  145. remove & replace bedroom door and paint with white oil base paint (CCHA will provide door & paint)

34.  146. remove & replace closet door and paint with white oil base paint (CCHA will provide door and paint)

34.  147. install new door knobs (CCHA will provide door knobs)


Heater Closet:


37.  148. paint heater closet (CCHA will provide paint)

37.  149. replace heater vent cover (CCHA will provide vent cover)


Restroom:


37.  150. remove medicine cabinet fix wall & place mirror (CCHA will provide glass)

34.  151. replace lavatory cabinet (CCHA will provide cabinet)

34.  152. replace lavatory faucet (CCHA will provide faucet)

34.  153. replace toilet (CCHA will provide toilet)

34.  154. remove & replace wall light fixture (CCHA will provide fixture)

34.  155. remove old Formica wall, retexture sheetrock wall and paint (CCHA will provide joint compound & paint)

34.  156. replace exhaust vent (CCHA will provide exhaust vent)



Breaker Box:


37.  157. paint metal cover (CCHA will provide gray spray paint)

Washer Room:


37.  158. replace washer connections (CCHA will provide washer connections)

37.  159. replace board (CCHA will provide board)


Restroom:


37.  160. remove & replace door and paint with white oil base paint (CCHA will provide door & paint)

34.  161. remove medicine cabinet, fix wall & place mirror (CCHA will provide glass)

34.  162. remove & replace light fixture (CCHA will provide light fixture)

34.  163. replace lavatory cabinet (CCHA will provide cabinet)

34.  164. replace lavatory faucet (CCHA will provide faucet)

34.  165. replace toilet (CCHA will provide toilet)

34.  166. remove old Formica wall, retexture sheetrock wall and paint (CCHA will provide joint compound & paint)

34.  167. replace exhaust vent (CCHA will provide exhaust vent)


Water heater closet:


37.  168. remove water heater to paint walls, ceiling, and replace tiles

37.  169. paint water heater closet (CCHA will provide paint)

Clothe Hamper:


 170. sand & paint with white oil base paint (CCHA will provide paint)

Right Hand Side 1st Bedroom:


37.  171. remove & replace bedroom door and paint with white oil base paint (CCHA will provide door & paint)

37.  172. install new doorknob (CCHA will provide door knob)

37.  173. sand & paint window sill with white oil base paint (CCHA will provide paint)

Right Hand Side 2nd Bedrom:


37.  174. remove & replace bedroom door and paint with white oil base paint (CCHA will provide door & paint)

37.  175. install new doorknob (CCHA will provide doorknob)

37.  176. remove wire on wall

37.  177. repair small hole on wall in closet

37.  178. replace window sill on left side window

37.  179. sand & paint window sills with white oil base paint (CCHA will provide paint)

Left Hand Side Bedroom:


37.  180. remove & replace bedroom door and paint with white oil base paint (CCHA will provide door & paint)

37.  181. install new doorknob (CCHA will provide doorknob)

37.  182. repair small hole on wall in closet

37.  183. sand & paint window sill with white oil base paint (CCHA will provide paint)

Outside Storage:


37.  184. remove & install light fixture (CCHA will provide fixture)

37.  185. paint storage door (CCHA will provide paint)

Proposal to be awarded at a later date

 

 

_______________________________________________________________________________________________________________________________________________________________________________

 

          

 

 

 



65 Castellano Circle | Brownsville, TX 78526-2823 | Phone : (956) 541-4983 | Fax : (956) 541-9637
Hours : Mon - Fri 8:00 a.m. to 5:00 p.m.
Equal Housing Oppurtunity | Equal Employment Opportunity
Computer Network Group (c) 2010